The boring operation will be carried out by means of self-erecting hydraulic drilling rig. In case of any hard materials encountered during drilling, the use of auger will be adopted to break the hard strata. 

The verticality of the holes will be monitored by the use of the spirit level while drilling the pile by checking the verticality of the Kelly bar from time to time. After the completion of drilling, the final depth shall be verified using a measuring scale mounted on the mast of the piling rig.  